Bill of Quantities
Α. STRIP OUT & DEMOLITION€18,600.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | DEMOLITION OF WALLS, FLOORS, DOOR AND WINDOW FRAMES, ETC., AS INDICATED ON THE DRAWINGS. USE OF TRUCKS, SKIPS AND CRANES FOR THE REMOVAL AND DISPOSAL OF DEMOLISHED MATERIALS. | Α-1 | lump sum | 1 | €18,600.00 | €18,600.00 |
| 2 | DAILY CLEANING OF ALL COMMON AREAS THROUGHOUT THE ENTIRE RENOVATION PERIOD. | Α-2 | lump sum | — | — | — |
| Section total Α | €18,600.00 | |||||
Β. MASONRY / DRY CONSTRUCTION€7,696.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | PLASTERING OF WALLS, INCLUDING MATERIALS, FOLLOWING DEMOLITION WORKS, WHERE REQUIRED. | Β-1 | lump sum | 1 | €1,500.00 | €1,500.00 |
| 2 | REPAIR OF DETERIORATED BALCONY PARAPETS. | Β-2 | lump sum | 1 | €450.00 | €450.00 |
| 3 | PARTITION WALLS CONSTRUCTED WITH DOUBLE-LAYER PLASTERBOARD (2+2 LAYERS), INCLUDING INSULATION. | Β-3 | m² | 35 | €48.00 | €1,680.00 |
| 4 | BRICKWORK CONSTRUCTION OF WALLS. | Β-4 | m² | 37 | €30.00 | €1,110.00 |
| 5 | CONSTRUCTION OF SUSPENDED CEILINGS AS INDICATED ON THE DRAWINGS. | Β-5 | m² | 21 | €36.00 | €756.00 |
| 6 | CONSTRUCTION OF A WALL RECESS TO ACCOMMODATE A SLIDING BALCONY DOOR. | Β-6 | lump sum | 1 | €400.00 | €400.00 |
| 7 | DOUBLE-LAYER FIRE-RESISTANT PLASTERBOARD CLADDING (FIREPLACE). | Β-7 | lump sum | 1 | €600.00 | €600.00 |
| 8 | SUPPLY AND INSTALLATION OF ACCESS PANELS IN CEILINGS, WHERE REQUIRED. | Β-8 | lump sum | 1 | €1,200.00 | €1,200.00 |
| Section total Β | €7,696.00 | |||||
Γ. FLOOR & WALL FINISHES€8,450.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | WATERPROOFING OF FLOORS IN ALL BATHROOMS AND BALCONY AREAS. | Γ-1 | lump sum | 1 | €2,200.00 | €2,200.00 |
| 2 | SUPPLY AND INSTALLATION OF NEW MARBLE WINDOW SILLS FOR EXTERNAL WINDOWS AND DOORS. | Γ-2 | pcs | 20 | €80.00 | €1,600.00 |
| 3 | SUPPLY AND APPLICATION OF HIGH-STRENGTH CEMENT MORTAR SCREED. | Γ-3 | m² | 155 | €30.00 | €4,650.00 |
| 4 | APPLICATION OF QUICK-SETTING CEMENT MORTAR SCREED. | Γ-4 | lump sum | — | €5,600.00 | — |
| Section total Γ | €8,450.00 | |||||
Δ. CARPENTRY€45,180.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | CUSTOM MADE KITCHEN WITH NATURAL OAK VENEER FINISH, CABINETS MADE OF MARINE-GRADE PLYWOOD WITH NATURAL OAK VENEER, HINGES WITH INTEGRATED SOFT-CLOSE MECHANISMS, AND RECESSED HIDDEN LIGHTING. | Δ-1 | lump sum | 1 | €26,430.00 | €26,430.00 |
| 2 | CUSTOM MADE JOINERY, INCLUDING DESKS, BEDS, AND WARDROBES IN THE COMMON AREAS AND BEDROOMS, FINISHED IN NATURAL OAK VENEER, AS WELL AS INSTALLATION OF CONCEALED LIGHTING. | Δ-2 | lump sum | 1 | €16,550.00 | €16,550.00 |
| 3 | NATURAL OAK VENEER WALL CLADDING. | Δ-3 | lump sum | — | — | — |
| 4 | BESPOKE BATHROOM CABINETRY MADE OF MARINE-GRADE PLYWOOD WITH NATURAL OAK VENEER FINISH. | Δ-4 | pcs | 2 | €1,100.00 | €2,200.00 |
| Section total Δ | €45,180.00 | |||||
Ε. PAINTING€8,000.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | SKIMMING, SANDING, AND PAINTING OF ALL WALLS, INCLUDING PROPER SURFACE PREPARATION AND APPLICATION OF HIGH-QUALITY, ECO-FRIENDLY EMULSION PAINT. | Ε-1 | lump sum | 1 | €5,300.00 | €5,300.00 |
| 2 | SKIMMING, SANDING, AND PAINTING OF ALL EXTERNAL WALLS, INCLUDING PROPER SURFACE PREPARATION AND APPLICATION OF HIGH-QUALITY, ECO-FRIENDLY ACRYLIC PAINT. | Ε-2 | lump sum | 1 | €2,000.00 | €2,000.00 |
| 3 | REPAIR AND PAINTING OF BALCONY RAILINGS. | Ε-3 | lump sum | 1 | €700.00 | €700.00 |
| Section total Ε | €8,000.00 | |||||
ΣΤ. FLOORING/ MARBLE€58,360.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | SUPPLY OF ALL MARBLE MATERIALS FOR THE BATHROOM AREAS. | ΣΤ-1 | lump sum | 55 | €196.00 | €10,780.00 |
| 2 | SUPPLY OF BATHROOM PARTITION. | ΣΤ-2 | pcs | 1 | €1,200.00 | €1,200.00 |
| 3 | SUPPLY OF MARBLE FOR CORRIDORS, LIVING ROOM, BALCONIES, AND OTHER SURFACES. | ΣΤ-3 | pcs | 120 | €180.00 | €21,600.00 |
| 4 | SUPPLY, CUTTING AND INSTALLATION OF MARBLE COUNTERTOPS IN BATHROOMS. | ΣΤ-4 | pcs | 2 | €250.00 | €500.00 |
| 5 | SUPPLY AND CUTTING OF MARBLE FOR THE KITCHEN. | ΣΤ-5 | lump sum | 1 | €3,200.00 | €3,200.00 |
| 6 | SUPPLY OF MARBLE FOR THE FIREPLACE AND BENCH. | pcs | 1 | €2,500.00 | €2,500.00 | |
| 7 | INSTALLATION OF MARBLE IN BATHROOMS. | lump sum | 48 | €135.00 | €6,480.00 | |
| 8 | INSTALLATION OF BATHROOM PARTITION. | pcs | 1 | €500.00 | €500.00 | |
| 9 | INSTALLATION OF MARBLE IN CORRIDORS, LIVING ROOM, BALCONIES, AND OTHER SURFACES. | pcs | 100 | €85.00 | €8,500.00 | |
| 10 | INSTALLATION OF MARBLE IN THE KITCHEN. | pcs | 1 | €1,600.00 | €1,600.00 | |
| 11 | INSTALLATION OF MARBLE ON THE FIREPLACE AND BENCH. | pcs | 1 | €1,500.00 | €1,500.00 | |
| Section total ΣΤ | €58,360.00 | |||||
Ζ. WOODEN FLOOR€2,550.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | SUPPLY AND INSTALLATION OF PRE-FINISHED WOODEN FLOORING IN THE BEDROOMS (UNDERLAY INCLUDED). | Ζ-1 | m² | 30 | €85.00 | €2,550.00 |
| Section total Ζ | €2,550.00 | |||||
Η. ALUMINIUM FRAMES€24,600.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | SUPPLY AND INSTALLATION OF ELVIAL ALUMINIUM FRAMES WITH A NATURAL MATT ANODISED FINISH (WHITE SHUTTERS AND ROLLER SHUTTERS). | Η-1 | lump sum | 1 | €24,600.00 | €24,600.00 |
| Section total Η | €24,600.00 | |||||
Θ. ELECTRICAL INSTALLATIONS€15,000.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | NEW ELECTRICAL INSTALLATION IN ACCORDANCE WITH THE DRAWINGS (WIRING, ELECTRICAL PANELS, ETC.). | Θ-1 | lump sum | 1 | €10,200.00 | €10,200.00 |
| 2 | ALARM SYSTEM – INCLUDES CAMERAS AND VIDEO RECORDER (INDICATIVE COST ESTIMATE). | Θ-2 | lump sum | 1 | €3,200.00 | €3,200.00 |
| 3 | SUPPLY OF SOCKETS, SWITCHES, AND VIDEO INTERCOM SYSTEM. | Θ-3 | lump sum | 1 | €1,600.00 | €1,600.00 |
| Section total Θ | €15,000.00 | |||||
Ι. PLUMBING/ AC/ UNDERFLOOR HEATING€41,805.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | NEW COMPLETE PLUMBING SYSTEM INSTALLATION. NEW COMPLETE AIR CONDITIONING SYSTEM INSTALLATION, INCLUDING ALL NECESSARY UNITS, IN ACCORDANCE WITH THE MECHANICAL ENGINEERING DRAWINGS. | Ι-1 | lump sum | 1 | €30,000.00 | €30,000.00 |
| 2 | UNDERFLOOR HEATING. | Ι-2 | m² | 93 | €85.00 | €7,905.00 |
| 3 | AUTOMATION SYSTEMS – ZONING AND INDEPENDENT CONTROL – THREE-WAY VALVES – FAN COIL CONNECTIONS – INITIAL START-UP AND COMMISSIONING OF HEAT PUMPS. | Ι-3 | lump sum | 1 | €2,500.00 | €2,500.00 |
| 4 | SUPPLY AND INSTALLATION OF A SOLAR WATER HEATER. | Ι-4 | pcs | 1 | €1,400.00 | €1,400.00 |
| Section total Ι | €41,805.00 | |||||
Κ. INTERNAL DOORS & FRAMES€12,920.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | SUPPLY AND INSTALLATION OF WOODEN HINGED DOORS. | Κ-1 | pcs | 5 | €1,900.00 | €9,500.00 |
| 2 | SUPPLY AND INSTALLATION OF SLIDING DOORS. | Κ-2 | pcs | 1 | €2,100.00 | €2,100.00 |
| 3 | SUPPLY AND INSTALLATION OF DOOR HANDLES. | Κ-3 | pcs | 6 | €220.00 | €1,320.00 |
| Section total Κ | €12,920.00 | |||||
Λ. STEEL WORKS€19,820.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | SUPPLY AND INSTALLATION OF GLASS DOORS (INDICATIVE PRICE – AWAITING FURTHER DETAILS FOR ACCURATE COST ESTIMATION). | Λ-1 | pcs | 2 | €2,400.00 | €4,800.00 |
| 2 | CUSTOM MADE DISPLAY CABINET WITH REEDED GLASS, 7 COLUMNS, AND SPECIAL SUPPORT BRACKETS. | Λ-2 | lump sum | 1 | €10,720.00 | €10,720.00 |
| 3 | CUSTOM MADE METAL CLADDING FOR THE CHIMNEY (INDICATIVE COST ESTIMATE). | Λ-3 | lump sum | 1 | €4,300.00 | €4,300.00 |
| Section total Λ | €19,820.00 | |||||
Μ. MISCELLANEOUS WORKS€9,450.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | SUPPLY AND INSTALLATION OF MIRRORS IN THE BATHROOMS AND CORRIDOR (INDICATIVE PRICE). | Μ-1 | lump sum | 1 | €1,300.00 | €1,300.00 |
| 2 | SUPPLY AND INSTALLATION OF FIREPLACE AND CHIMNEY (INDICATIVE COST ESTIMATE). | Μ-3 | pcs | 1 | €2,650.00 | €2,650.00 |
| 3 | ALL NECESSARY TRANSPORTATION THROUGHOUT THE DURATION OF THE WORKS. | Μ-5 | lump sum | 1 | €5,500.00 | €5,500.00 |
| Section total Μ | €9,450.00 | |||||
Ο. PROJECT MANAGEMENT / UNFORESEEN EXPENSES€27,300.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | SIGHT MANAGEMENT, SUPERVISION OF WORKS & COMPLETION BY 30/6/2027. | Ο-1 | lump sum | 1 | €27,300.00 | €27,300.00 |
| Section total Ο | €27,300.00 | |||||
Net total€299,731.00
VAT 24%€71,935.44
Total incl. VAT€371,666.44
Commercial Terms
Acceptance of Proposal
By signing below, the client confirms that they have read and accept the scope of works, the amounts and the commercial terms set out above.
For Nest Land
Name & signature
The Client
Name & signature · Date
Follow your project
Scan the code for access to the secure Nest Land portal — progress, payments and documents, all in one place.
portal.nest-land.com