Project proposal
SEKREVSKI NEW
| Quote no. | NL-2026-4VESM |
| Date | 11/10/2026 |
| Valid for | 30 days |
- Client
- SEKREVSKI
- Site address
- VOULIAGMENI
Bill of Quantities
Α. Strip-Out & Demolition€45,600.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | Demolition of walls, floors, frames, etc., as indicated in the drawings, including the use of trucks, skips and cranes for their removal and disposal. | Α-1 | lump sum | 1 | €45,600.00 | €45,600.00 |
| 2 | Daily cleaning of the common areas throughout the entire duration of the renovation works. | A-2 | lump sum | — | — | — |
| Section total Α | €45,600.00 | |||||
Β. Partitions & Masonry€21,186.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | Plastering of walls, including materials, where required following demolition works. | B-1 | lump sum | 1 | €4,800.00 | €4,800.00 |
| 2 | Repair of deteriorated balcony parapets. | Β-2 | lump sum | 1 | €2,500.00 | €2,500.00 |
| 3 | Drywall partitions (2+2 layers) with insulation. | Β-3 | m2 | 85 | €48.00 | €4,080.00 |
| 4 | Construction of brick walls. | B-4 | m2 | 115 | €30.00 | €3,450.00 |
| 5 | Construction of suspended ceilings in accordance with the design drawings. | B-5 | m2 | 46 | €36.00 | €1,656.00 |
| 6 | Construction of a wall recess to accommodate the installation of a sliding balcony door. | B-6 | lump sum | 3 | €400.00 | €1,200.00 |
| 7 | Construction of a wall recess to accommodate the installation of a sliding balcony door. | B-7 | lump sum | 3 | €600.00 | €1,800.00 |
| 8 | Supply and installation of access panels in ceilings, where required. | B-8 | lump sum | 1 | €1,700.00 | €1,700.00 |
| Section total Β | €21,186.00 | |||||
C. Floor & Wall Finishes€20,250.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | Waterproofing of floors in all bathroom and balcony areas. | C-1 | lump sum | 3 | €2,200.00 | €6,600.00 |
| 2 | Supply and installation of new marble sills for the external window and door frames. | C-2 | m2 | 60 | €80.00 | €4,800.00 |
| 3 | Supply and installation of high-strength cement screed. | C-3 | m2 | 295 | €30.00 | €8,850.00 |
| 4 | Fast-setting cement screed (floor installation after 24 hours) – optional. Not included in the final total. | C-4 | lump sum | — | €13,000.00 | — |
| Section total C | €20,250.00 | |||||
D. Painting€20,100.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | Skimming, sanding and painting of all walls, including proper surface preparation and application of a high-quality, eco-friendly plastic paint. | D-1 | lump sum | 1 | €16,000.00 | €16,000.00 |
| 2 | Skimming, sanding and painting of all external walls, including proper surface preparation and application of a high-quality, eco-friendly acrylic paint. | D-2 | lump sum | 1 | €2,300.00 | €2,300.00 |
| 3 | Repair and painting of balcony railings. | D-3 | lump sum | 1 | €1,800.00 | €1,800.00 |
| Section total D | €20,100.00 | |||||
E. Plumbing/ AC/ Underfloor heating€126,625.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | New complete plumbing system installation. New complete air-conditioning system installation, including all necessary units, in accordance with the mechanical drawings. | E-1 | lump sum | 1 | €98,200.00 | €98,200.00 |
| 2 | Underfloor heating system. | E-2 | m2 | 245 | €85.00 | €20,825.00 |
| 3 | Automation and control systems, individual zone controls, three-way valves, fan coil connections, and initial start-up and commissioning of heat pumps. | E-3 | lump sum | 1 | €7,600.00 | €7,600.00 |
| Section total E | €126,625.00 | |||||
F. ALUMINIUM FRAMES€65,000.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | Supply and installation of aluminium frames. | F-1 | lump sum | 1 | €65,000.00 | €65,000.00 |
| Section total F | €65,000.00 | |||||
G. Electrical Installations€35,200.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | New electrical installation in accordance with the drawings, including wiring, electrical panels, etc. | G-1 | lump sum | 1 | €35,200.00 | €35,200.00 |
| Section total G | €35,200.00 | |||||
H. Project management / supervision / unpredicted expenses
Project management / supervision / unpredicted expenses€70,000.00
| Α/Α | Description of works | Code | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|---|---|
| 1 | Sight management, Supervision of works & Completion by 30/06/2027. | H-1 | lump sum | 1 | €70,000.00 | €70,000.00 |
| Section total H | €70,000.00 | |||||
Net total€403,961.00
VAT 24%€96,950.64
Total incl. VAT€500,911.64
Commercial Terms
Acceptance of Proposal
By signing below, the client confirms that they have read and accept the scope of works, the amounts and the commercial terms set out above.
For Nest Land
Name & signature
The Client
Name & signature · Date